• lntl@lemmy.ml
    link
    fedilink
    arrow-up
    77
    arrow-down
    23
    ·
    edit-2
    11 months ago

    This is the German plan:

    1. Shutdown the nuclear plants
    2. Burn more lignite
    3. WFH

    The council said assumptions made by the transport ministry on the effectiveness of the planned and already implemented measures, such as a discounted national rail ticket, a CO2 surcharge on truck tolls and increased working from home, were also optimistic. “Private vehicle individual transport is not addressed, so to speak. And that is ultimately a gap in the transport programme,” Brigitte Knopf, deputy chairwoman of the council, told a news conference presenting the report findings on Tuesday

    The plan for transportation emissions, 2/3 of the target to be cut, is WFH. Yikes!

    • Sodis@feddit.de
      link
      fedilink
      arrow-up
      19
      ·
      11 months ago

      @Grimpen@lemmy.ca You are misinformed there. The energy sector reaches its goal and offshore wind farms and solar panels are actually over-performing, meaning more are built than was planned for this year. The sectors largely missing their goals are the transport and the building sector.

    • cedeho@feddit.de
      link
      fedilink
      arrow-up
      19
      arrow-down
      5
      ·
      11 months ago

      If all the subsidiaries that went into nuclear power the last few decades went to renewables instead Germany would have no issues at all, but hey… giving tax payer money to some very few giant energy companies is more important than creating a Europe leading renewables energy sector that does not rely on russian fossils or nuclear material.

      You should know that nuclear power is very expensive while renewables are absurd crazy cheap. I’ve been to a German Endlager and it takes years and BILLIONS of Euros just to seal this thing off. Guess who is paying? Mostly tax payers.

      There’s be no company in Germany which would be willing to run a nuclear power plant if they were responsible for the permanent disposal of their waste on their own instead of letting the tax payer pay (most of) for it.

      • lntl@lemmy.ml
        link
        fedilink
        arrow-up
        1
        ·
        edit-2
        11 months ago

        That’s all well and good in the energy sector. What about transportation? If I understand correctly, transportation makes up the majority of the emissions Germany aims to cut

        • Zacryon@feddit.de
          link
          fedilink
          arrow-up
          6
          ·
          11 months ago

          Sadly, we have a long history of incompetent transport ministers. That didn’t change with the last elections.

    • GenEcon@lemm.ee
      link
      fedilink
      arrow-up
      17
      arrow-down
      3
      ·
      edit-2
      11 months ago

      Funny, because the energy sector was the only on track to fulfill the targets. Last year it even overshot its targets and is expected to again save more CO2 as planned in 2023.

      Maybe, just maybe, its more relevant that other sectors are managed by the FDP (market liberals) and SPD (social democrats), while energy is managed by die Grünen (greens).

      • lntl@lemmy.ml
        link
        fedilink
        arrow-up
        1
        arrow-down
        1
        ·
        11 months ago

        Do you know about the transportation sector? It is where 2/3 of Germanys planned reduction is.

    • nexusband@lemmy.world
      link
      fedilink
      arrow-up
      20
      arrow-down
      9
      ·
      11 months ago

      How about you guys stop this bullshit about the nuclear plants stuff? They were scheduled to be shut down for a VERY long time, the biggest mistake was selling out nearly all the renewable energy manufacturing to China. Nuclear power is only making a profit, if it’s subsidized like crazy.

      Not only that - A LOT of Germans are actively against putting up more wind power, let alone photovoltaics. Which is what over 50% voted “against” as well. Those that didn’t go voting, have lost all say in it, so yeah. That’s not a political issue, we Germans are the issue.

      • Brocon@lemmy.world
        link
        fedilink
        arrow-up
        14
        arrow-down
        2
        ·
        11 months ago

        You forgot to add that we were once leader in solar tech, but that industry got destroyed willingly by the then ruling CDU and Peter Altmeyer.

        • nexusband@lemmy.world
          link
          fedilink
          arrow-up
          2
          ·
          11 months ago

          No - it was destroyed because some idiot higher up in those companies decied, it’s cheaper to sell to China. Same goes for Kuka and countless other spineless fu**s in those companies. Yes, politics plays A role, but they do not make the decisions.

      • JohnDClay@sh.itjust.works
        link
        fedilink
        arrow-up
        9
        arrow-down
        3
        ·
        11 months ago

        So why not modernize or replace the nuclear plants? Battery storage isn’t anywhere close to being able to store baseline energy for a full renewable grid.

        I agree it’s a perception issue, but that doesn’t mean nothing can be done about it.

        • Muetzenman@feddit.de
          link
          fedilink
          arrow-up
          6
          arrow-down
          1
          ·
          edit-2
          11 months ago

          Most plants are to old to modernize and building new ones is expensive, takes decates and dosn’t solve the dependency on uran and the nuclear waste problem. Renewables were always the longtearm goal and gas for shortages. Nuclear cant be easy switched on or off, so they aren’t a good solution to help with energy lows.

          • nexusband@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            11 months ago

            Exactly, just look at Olkiluoto in Finnland. 11 Billion Euros. For comparison, right now, 1 MW in an offshore wind park is about 4 Million Euros. Meaning, for 1600 MW, that’s 6400 Million, or 6,4 Billion. That’s nearly HALF of Olkiluoto’s cost.

        • nexusband@lemmy.world
          link
          fedilink
          arrow-up
          7
          arrow-down
          2
          ·
          11 months ago

          Because the money for modernizing, let alone replacing those plants is a lot better invested in renewables. Battery Storage is very close to store baseline energy, not in Lithium Batteries though and the projected cost for Redox-Flow Batteries is going to be falling like crazy. It already is on the same level as Lithium, and while it is less energy dense, it’s safer, easier to operate and especially longer to operate. The Dalian VFB in Liaoning, Dalian, China is one of the first “bigger” stations to come online, but there are already a lot of plans. I also have one in my house.

            • nexusband@lemmy.world
              link
              fedilink
              arrow-up
              1
              ·
              11 months ago

              7,5 kWh, max. continous power is “only” 3 kW, but that’s more than enough to get the house over the night and even for quite some time in to the next day if the weather is bad. Non flammable, no higher insurance rating, and so on.

      • lntl@lemmy.ml
        link
        fedilink
        arrow-up
        4
        arrow-down
        1
        ·
        11 months ago

        Who cares about renewables v nuclear? Either one will get us there.

        If I understand correctly Germany does not have a plan to address transportation emissions.

        • nexusband@lemmy.world
          link
          fedilink
          arrow-up
          2
          ·
          11 months ago

          If I understand correctly Germany does not have a plan to address transportation emissions.

          Who has in the EU? Switching to BEVs will do shit overall.

    • Grimpen@lemmy.ca
      link
      fedilink
      arrow-up
      25
      arrow-down
      17
      ·
      11 months ago

      If only there was some means of replacing all that coal with a non-carbon intensive source of energy that isn’t dependant on the weather…

      Has anyone heard of such a technology?


      Sarcasm aside, that Germany shut down their last two nuclear reactors so recently and carried through is astounding. The excuses are mind-boggling. They’re old? Refurbishing is cheaper and faster than new built. They need re-certification? Then do it.

      • Killing_Spark@feddit.de
        link
        fedilink
        arrow-up
        32
        arrow-down
        4
        ·
        edit-2
        11 months ago

        It’s more efficient to use the money required for

        1. The inspection
        2. The renovations
        3. Acquiring new fuel

        And spend it on renewables than to do the above.

        Also a big factor noone seems to care about: staff. The people who worked there have other jobs now. You can’t just plop a reactor plant somewhere and expect it to make electricity you need highly specialised staff for that. We also did not invest into training new staff because why would we, with the stop for nuclear power being decided 10 years ago.

        • Corkyskog@sh.itjust.works
          link
          fedilink
          arrow-up
          3
          ·
          11 months ago

          Highly Specialized staff

          I watched this animated documentary from the states called The Simpsons that seems to state otherwise.